Project Track Record

52 Projects (On-Going + Completed)

Main contract awards from government agencies, complemented by extensive experience in specialist sub-contracting and joint ventures with leading A1-grade contractors in Singapore.

39
Completed
13
Ongoing
52
Total Projects
Featured Projects

PUB Drainage Reference Projects

In-depth case studies of our flagship Public Utilities Board engagements — nationwide drainage repair, large-scale roadside drain upgrades and 24/7 emergency response.

PUB · Improvement to Roadside Drains V

Contract W3 — Enterprise Road, Pioneer, Sunset Way & Pasir Panjang

  • Completed roadside box drain with new safety railings and HDPE service pipes
  • Resurfaced road with new "AHEAD" lane marking and roadside walkway
  • Newly paved heritage-style stone walkway and stone retaining wall

Extensive drainage and infrastructure upgrades across 10 locations including Enterprise Road, Pioneer, Sunset Way, Pasir Panjang and Dover Avenue — U-drains, box drains, culverts and back-lane systems delivered around live 22 kV – 400 kV cable networks, the Gas Transmission Pipeline, NParks-protected heritage trees and staged LTA traffic diversions.

PUB · Term Contract for Minor Drainage Construction Works

3rd Term — Nationwide Drainage Standby (running to October 2026)

  • 350m precast two-tiered trapezoidal drain installed at Seletar North Link
  • Long coastal drainage outlet alongside container terminal
  • Shotcrete structural rehabilitation works inside Robertson Bridge underside
  • Spalling concrete and structural rehabilitation works on existing canal wall

Nationwide 24/7 standby for urgent PUB drainage repairs — addressing spalling concrete, collapsed walls and structural failures across any location in Singapore. Highlight: a 350-metre two-tiered trapezoidal drain at Seletar North Link delivered in three months using precast panel technology versus the typical multi-month in-situ casting timeline.

Private Sector · Residential Condominium Portfolio

Penrose, Leedon Green, Lentor Modern, Normanton Park & More

  • Aerial view of completed condominium driveway, kerbs and cycling path integration
  • Aerial of new condominium entrance with traffic diversion barriers and roadworks
  • Aerial of completed signalised junction with new road markings serving condominium development
  • Aerial of completed roadworks adjacent to new residential blocks

Specialist sub-contractor on multiple new condominium developments delivering box drains, covered linkways, road widening and junction enhancements — including LTA land-parcel-sale roadworks executed under multi-stage traffic diversions, signalised traffic islands and live-traffic safety protocols.

LTA · MRT Station & North-South Corridor

NSC Tunnel Drainage Diversion (Sin Ming Ave – Ang Mo Kio Ave 3)

  • Sheet pile rig and crawler crane working at NSC tunnel drainage diversion site
  • Deep excavation with steel sheet piling for NSC tunnel drainage works
  • Long open trench with ventilation ducts at NSC tunnel construction site
  • Completed precast box culvert internal view at 1339 Ang Mo Kio Avenue 1
  • Buildwick crew lowering precast drainage panel into excavated trench
  • Reinforcement rebar mat installed for new RC drain base slab

Drainage diversion for LTA Contract N109A — widening a live drain into a 4.5-metre box culvert between Sin Ming Avenue and Ang Mo Kio Avenue 3 using Z-shaped sheet piles, system formworks and 24/7 site operations to meet tunnelling milestones at the most downstream Kallang River outfall.

PUB · Residential Estate Upgrading Programme

Roadside Drain Upgrading — River Valley, Clementi, Limau, Moonstone & More

  • Completed heritage-style stone walkway, kerb and landscaping in upgraded residential estate
  • Newly resurfaced residential street with footpath and zebra crossing in private estate
  • Upgraded canal-side drain with new safety railings adjacent to commercial shophouses
  • New tactile paving and crossing at gated condominium entrance after EUP works

Main specialist sub-contractor across multiple PUB Residential Estate Upgrading contracts (River Valley, Clementi, Limau, Moonstone, St. Michael's and more) — over 20 km of drainage delivered to date with proactive stakeholder engagement and phased execution to maintain resident accessibility throughout.

Work in the Field

Featured Work

On-site photographs from completed Buildwick projects across drainage, road, junction and reinstatement scopes.

  • Carried out road diversion works comprising temporary lane closures, traffic barrier installation, and new junction road markings in compliance with traffic management and safety standards
    Carried out road diversion works comprising temporary lane closures, traffic barrier installation, and new junction road markings in compliance with traffic management and safety standards
  • Completed footpath, cycling path and bus shelter works as part of integrated commuter infrastructure.
    Completed footpath, cycling path and bus shelter works as part of integrated commuter infrastructure.
  • Executed precast drain culvert installation for drainage works, ensuring precise placement and integration within constrained site conditions.
    Executed precast drain culvert installation for drainage works, ensuring precise placement and integration within constrained site conditions.
  • Aerial view of completed junction improvement works, including traffic island installation to optimise traffic flow and enhance road safety.
    Aerial view of completed junction improvement works, including traffic island installation to optimise traffic flow and enhance road safety.
  • Executed earthworks, turfing and site reinstatement works under nearby viaduct conditions, ensuring proper restoration and integration with surrounding infrastructure.
    Executed earthworks, turfing and site reinstatement works under nearby viaduct conditions, ensuring proper restoration and integration with surrounding infrastructure.
  • Executed comprehensive resurfacing and road marking works within a constrained night schedule, successfully completing and reopening the roadway.
    Executed comprehensive resurfacing and road marking works within a constrained night schedule, successfully completing and reopening the roadway.
  • NKF Integrated Renal Centre @ 500 Corporation Road — RC works for A&A and ancillary structures (sub-station, bin centre, drop-off porch, linkway). Provision of RC labour for A&A works, including structural alteration, installation of new reinforced concrete elements, and construction of ancillary structures comprising sub-station, bin centre, drop-off porch, and linkway.
    NKF Integrated Renal Centre @ 500 Corporation RoadRC works for A&A and ancillary structures (sub-station, bin centre, drop-off porch, linkway). Provision of RC labour for A&A works, including structural alteration, installation of new reinforced concrete elements, and construction of ancillary structures comprising sub-station, bin centre, drop-off porch, and linkway.
  • Sembawang Country Club — Supply of labour for RC works (Sub-contract). Provision of RC labour for A&A works to an existing 2-storey clubhouse, including structural alterations, reinforcement installation, and new terrace erection.
    Sembawang Country ClubSupply of labour for RC works (Sub-contract). Provision of RC labour for A&A works to an existing 2-storey clubhouse, including structural alterations, reinforcement installation, and new terrace erection.
  • Toh Guan Ramp-up Warehouse — Supply of labour for sub-structure works (Sub-contract). Provision of labour for substructure works, including earthworks, foundation construction, pile caps, and footings for a 6-storey ramp-up warehouse with ancillary office.
    Toh Guan Ramp-up WarehouseSupply of labour for sub-structure works (Sub-contract). Provision of labour for substructure works, including earthworks, foundation construction, pile caps, and footings for a 6-storey ramp-up warehouse with ancillary office.
  • Concourse Skyline @ Beach Road — Supply labour for reinforced concrete work at Podium & Residential Blocks (Sub-contract). Provision of RC labour for superstructure works of a mixed-use development, comprising a 41-storey residential tower and multi-storey podium structure.
    Concourse Skyline @ Beach RoadSupply labour for reinforced concrete work at Podium & Residential Blocks (Sub-contract). Provision of RC labour for superstructure works of a mixed-use development, comprising a 41-storey residential tower and multi-storey podium structure.
Active Pipeline

On-going Projects

Ongoing projects across civil, infrastructure, earthworks, and building works, supported by long-term partners and joint venture collaborations.

Active

Infrastructure Works at Jurong East Central & Jurong West Street 93

Construction of trunk sewer at Jurong East Central; earthwork, road widening and junction improvement works at Jurong West Street 93.

Active

Road Widening at Tanjong Rhu Road, Kampong Arang Road & Sampan Place

Earthwork, road widening, drainage, bus shelter installation, high & low linkway and junction improvement works.

Active

Road Improvement Work at Bukit Merah View

Earthwork, road widening, drainage and junction improvement works.

Active

PUB Term Contract for Minor Drainage Construction & Repair Works (Contract No. 03)

24/7 response team for PUB — flash-flood dewatering, construction of new drains, road and concrete repair for spalling works.

Active

Bukit Batok Neighbourhood 4 Contract 28 (Public Housing 5 blocks · 790 units)

CE works above the contiguous bored pile wall (Phase 1): construction of new box drain and other CE drainage.

Active

Seletar Green Walk & Luxus Hill Heights Landed Housing (156 units, Phase 10)

Earthwork, construction of new box drain, new road and other enhancement works for 156-unit envelope-control landed development in Serangoon planning area.

Active

LTA N109A — North-South Corridor Tunnel (Sin Ming Avenue to Ang Mo Kio Avenue 3)

Demolition, earthwork disposal and widening of existing drain to 4.5m wide culvert drain; sheet piling, design and diversion of live drain.

Active

Hoe Chiang Road / Lim Teck Kim Road Hotel & Service Apartments — External Works

External works for a part 3-storey, part 30-storey hotel (808 rooms) and service apartment (37 rooms) development with 2 basement carparks: road widening, drainage, bus shelter and junction improvements.

Active

Emerald Katong — Neighbourhood Park CE Works

External and civil engineering works for the neighbourhood park.

Active

Tampines Street 62 Executive Condominium (14 blocks · 760 units)

Earthwork, external and civil engineering works for a 14-block 14-storey executive condominium with basement carpark and communal facilities.

Active

Contract CR207 — Earthworks (Excavation & Disposal)

Earth excavation and disposal works.

Active

Yishun Avenue 1 (YS N5 C11) Public Housing — 10 blocks 14-storey · 987 units

Earth excavation and disposal works for a 10-block 14-storey HDB development with multi-storey carpark, commercial podium and communal facilities.

Active

Sembawang N4C4 Public Housing — 4 blocks 18-storey + Multi-Storey Carpark

Earth excavation and disposal works for a 4-block 18-storey residential development with multi-storey carpark.

BCA CW02 · Civil Engineering

Completed Civil Engineering Projects

27 delivered drainage, road and infrastructure projects across PUB, LTA, HDB, JTC, URA and private residential developments.

URA Zion Road — Design & Construction of Temporary Carpark

Design-and-build of new surface carpark including earthwork, driveway, drainage and M&E related works.

PUB Improvement to Roadside Drains V — Contract W3

Road raising and widening, junction diversions, improvement of existing roadside drains to new box drain with footpath, RC box culvert, kerb and water main pipe diversion across Enterprise Road, Pioneer Sectors 1 & 2, Sunset Way, Jalan Pelepah, Pasir Panjang Road, South Buona Vista, Dover Avenue and Bukit Timah Road.

PUB Term Contract for Minor Drainage Construction & Repair Works (Contract No. 02)

Immediate response team for PUB — flash-flood dewatering, construction of new drain, road and concrete repair for spalling structural drain works.

PUB Term Contract for Minor Drainage Construction & Repair Works (Contract No. 01)

Immediate response team for PUB — flash-flood dewatering, construction of new drain, road and concrete repair for spalling structural drain works.

Penrose — Residential Flat Development at Sims Drive (Geylang)

Earthwork, construction of new box drain, linkway, road widening / new road and enhancement to existing road junction & slip road for a 5-block 18-storey residential development with childcare centre, MSCP and communal facilities.

HDB Geylang Contract 13 (Building Works · 1,382 dwelling units)

Earthworks, drainage, external new road and EPS works (Part A + Part B contingency works).

Holland Road / Leedon Heights / Farrer Road Condominium (7 blocks · 638 units)

Entrance culvert and covered drain plus earthwork, new box drain, linkway and road widening / new road / enhancement works integrated with an 8.1m drainage reserve.

Normanton Park — 9 blocks 24-storey + 22 strata terrace + retail (1,862 flats)

Construction of new box drain and road widening / new road and enhancement works for a 9-block 24-storey residential, 22-unit strata terrace, restaurant and 7 shops with 2 basement carparks.

LTA J111 — Jurong Region Line: Enterprise Station, Tukang Station & Viaduct

Supply of labour and tools for construction of RC drains and road works.

LTA DE 145 — Bus Stop Infrastructure Enhancement & Construction

Demolition of existing bus shelters and construction of new bus shelters and road.

HDB Punggol East Contract C49 — Building External Works

Earthwork disposal, construction of new CE drain and service road.

LTA DE 137 — Proposed Commuter Infrastructure Enhancement

Earthwork disposal and supply of labour & tools for construction of RC enhancement works.

Lentor Central / Lentor Drive Residential Flats (3 blocks · 605 units)

Earthwork, construction of new CE drain and proposed new road & enhancement works.

PUB Roadside Drains EUP Batch 8 Contract 7 — Limau Estate (Western Sector)

Upgrading of residential estate existing C7 drain to new box drain with footpath, box culvert, kerb and other civils works.

HDB Surface Carpark Batch 71 (BM12) — Improvement Works

Construction of new surface carpark lots, mill & patch of existing driveways and drainage.

HDB Tampines N6C8-10 — CE Drain Works

Construction of new CE drain and service road.

JTC Bulim Square Multi-User (B2) Industrial Development

Bulim Square precast yard reinstatement works.

LTA N109A — North-South Corridor Tunnel (Sin Ming to Ang Mo Kio Ave 3)

Demolition and widening of existing drain to 4.5m wide culvert drain; sheet piling, design & diversion of live drain.

HDB Gerald Drive Re-alignment & Outlet Drain Widening (Hougang Town)

Widening of existing outlet drain to 30m wide outlet drain.

LTA C715 — NEL Extension Cut & Cover and Bored Tunnels

Supply material, labour, tools and machineries to remove existing concrete/hardcore access and reinstatement with closure.

HDB Punggol North — Infrastructure Works

Excavation and earthwork, construction of new covered drain and rigid pavements.

CR203 Eng Neo Avenue — Site Hoarding & Earth Excavation

Supply & installation of temporary site hoarding & site gate plus earth excavation & disposal.

LTA ER370 — Extension of Sengkang West Way (Jalan Kayu & Sengkang West Road)

Construction of new road, drain, cycling path and kerbs.

LTA DE 162 — HDPE Pipes Across Telok Paku Bridge

Construction of centre median parapet wall along Telok Paku Road & Bridge.

PUB Roadside Drains — River Valley / Clementi / Ettrick / East Coast / King's Road

Upgrading of existing C7 drain to new box drain with footpath, box culvert, kerb and other civils works.

PUB Roadside Drains EUP Batch 8 Contract 6 — Limau Estate (Eastern Sector)

Upgrading of residential estate existing C7 drain to new box drain with footpath, box culvert, kerb and other civils works.

PUB Roadside Drains EUP Batch 7 Contract 5 — Moonstone Lane / St Michael's Estates

Upgrading of residential estate existing C7 drain to new box drain with footpath, box culvert and kerb works.

BCA CW01 · General Building

Completed General Building Projects

12 reinforced concrete and structural works engagements for commercial, residential, industrial and institutional developments — delivering labour, formwork, rebar and precast installation expertise.

Alexandra Terrace Commercial Building — Block 2, Block 3 & Podium

Supply of labour for RC works — concrete, reinforcement rebar and formwork.

79 Robinson Road — 29-storey Office Development (Downtown Core)

Supply of labour for RC works — concrete, reinforcement rebar and formwork for a 29-storey office with 5-storey podium, 2 basements and underground pedestrian network (UPN).

Fishery Port Road — Warehouse Ramp

Supply of labour for RC works — concrete, reinforcement rebar and formwork.

Scotts Road Residential Flats Development

Supply of labour for RC works — formwork.

Jalan Pemimpin Commercial Building

Supply of labour for RC works — concrete, reinforcement rebar and formwork.

JTC Factory at Tanjong Kling — Block 3, 5, 7, 9

Supply of labour for RC works — concrete, reinforcement rebar and formwork.

HDB Remaking of Heartland (ROH) — Hougang N1 & N2

Construction of new playground, shelter, drains, footpaths and landscaping.

Sky Everton Park — 36-storey Residential (262 units)

Supply of labour for RC walls and external roadside drains.

NKF Integrated Renal Centre @ 500 Corporation Road (Jurong Police Station A&A)

Supply of labour for RC works — A&A to existing 3-storey building, new sub-station, bin centre, drop-off porch, linkway and other ancillary structures.

GEMS International School — Block B & C Precast Installation

Supply of labour for installation of precast panels.

Bukit Timah Primary School — A&A and New 4-storey ISH

Supply of labour for RC works — new sport hall and external roadside drains.

Choa Chu Kang Cemetery Office

RC drainage, IC sump and RC fencing wall with footings.